Installation

  • Start by putting Lintols on load bearing (220mm) wall
  • Space Lintols by using block with each of the blocks sitting on Lintol
  • Start by propping Lintols 1-2m apart and prop every second lintol
  • Blocks can how ever be placed in between Lintols, leave blocks out where you have placed plank
  • Where blocks have been left out, place 2 y10 steel
  • If lights are needed slip out Concrete block and replace with steel light box
  • Place welded mesh on top pf block and tie down
  • 25 mps pump mix concrete must be used to form a 60mm screed on top of block
  • Use water level to level concrete that has been pumped upon slab
  • Water slab 3 times a day for 2 days
  • Leave supports for 14-21 days