Installation
- Start by putting Lintols on load bearing (220mm) wall
- Space Lintols by using block with each of the blocks sitting on Lintol
- Start by propping Lintols 1-2m apart and prop every second lintol
- Blocks can how ever be placed in between Lintols, leave blocks out where you have placed plank
- Where blocks have been left out, place 2 y10 steel
- If lights are needed slip out Concrete block and replace with steel light box
- Place welded mesh on top pf block and tie down
- 25 mps pump mix concrete must be used to form a 60mm screed on top of block
- Use water level to level concrete that has been pumped upon slab
- Water slab 3 times a day for 2 days
- Leave supports for 14-21 days
|